Hi Davin
Great game, playing solo now. Working out my Economic chain.
I have a question with the Unload (and load) order,
UNLOAD [Ship ID] [Quantity] [Item] [Quantity] [Item]
What happens if [Ship ID] is a flagship for the fleet, can it load/unload all the cargo bays in the fleet?
So I have 3 freighters
FX 1001, 1002, 1003 consist /;;10/20-1
1002, 1003 joined to 1001
Can put it as one order -
UNLOAD 1001 27 PV
or do I have to put it as 3 separate orders
UNLOAD 1001 10 PV
UNLOAD 1002 10 PV
UNLOAD 1003 7 PV
I need to put this unload order to change it from a SHUTTLE order to a DEVELOP and its currently in a Production system.
Thanks
vape
Great game, playing solo now. Working out my Economic chain.
I have a question with the Unload (and load) order,
UNLOAD [Ship ID] [Quantity] [Item] [Quantity] [Item]
What happens if [Ship ID] is a flagship for the fleet, can it load/unload all the cargo bays in the fleet?
So I have 3 freighters
FX 1001, 1002, 1003 consist /;;10/20-1
1002, 1003 joined to 1001
Can put it as one order -
UNLOAD 1001 27 PV
or do I have to put it as 3 separate orders
UNLOAD 1001 10 PV
UNLOAD 1002 10 PV
UNLOAD 1003 7 PV
I need to put this unload order to change it from a SHUTTLE order to a DEVELOP and its currently in a Production system.
Thanks
vape